Design of foundations, concrete structures and associated facilities for CSN’s single and tandem wagon dumpers at the Port of Itaguaí. The scope included control rooms, electrical panels, hydraulic systems, cable trenches, access tunnels, wagon positioners, a screening building, a 30-ton surge bin, substations, belt conveyors, transfer towers, a sampling tower, a temporary railcar unloading station and other related facilities.