Foundation design for thickeners at the Conceição, Cauê and Brucutu mines. Detailed design associated with the Tailings Filtration Project (PDR Cava) at the Brucutu mine in São Gonçalo do Rio Abaixo, Minas Gerais. Design compliance assessment of the precast structures for Vale’s primary and secondary crushing buildings in Itabira.